Complete guide for property owners and investors about real estate legalization in 2025
TABLE OF CONTENTS
- New Property Legalization Law 2025
- What Is Illegal Real Estate in Montenegro
- How to Check the Legal Status of Property
- Which Objects Are Subject to Legalization
- Documents for Legalization
- Legalization Procedure: Step-by-Step Instructions
- Legalization Timelines
- Cost of Legalization
- Consequences of Non-Legalization
- Professional Legalization Assistance
NEW PROPERTY LEGALIZATION LAW IN MONTENEGRO 2025
In August 2025, Montenegro enacted a new Law on Legalization of Illegally Constructed (Unauthorized) Buildings (published in the "Official Gazette of Montenegro", No 91/2025 dated August 6, 2025). This law directly affects every owner of a house, apartment, or commercial property built without complete construction permits or occupancy permits.
CRITICALLY IMPORTANT:
Legalization applications must be submitted within 6 MONTHS from the law's effective date (before the middle of february of 2026).
Since August 2025, notaries have SUSPENDED TRANSACTIONS with properties having "nema dozvolu" (no permit) status. Selling or renting real estate without confirmed legalization documents becomes IMPOSSIBLE.
Key Provisions of the New Law
Extended Legalization Opportunities
- Clear technical, legal, and territorial criteria
- Ability to legalize objects built before the law came into force
- Electronic submission of applications and documents
Financial Conditions
- Payment installment plans for up to 30 years for residential properties
- Up to 20% discount for lump-sum payment
- Special benefits for socially vulnerable categories (up to 90%)
Administrative Division
- Objects up to 500 m² are legalized through municipalities (opština)
- Large objects and those in protected zones through state authorities
- Clear review periods: up to 2 years (with possible extension to 3 years)
Impact of the Law on the Real Estate Market
Since August 2025, notaries have suspended transactions with properties that have "nema dozvolu" (no permit) status in the list nepokretnosti. Now selling or renting real estate without confirmed legalization documents becomes impossible.
DEADLINE: Until the MIDDLE OF FEBRUARY OF 2026
This is the absolute deadline for submitting applications. Missing this deadline means:
- Inability to sell or rent the property
- Administrative fines
- Increased property taxes
- Risk of forced demolition
WHAT IS ILLEGAL REAL ESTATE IN MONTENEGRO
Definition of Unauthorized Object
According to Montenegro's legislation, an unauthorized (bespravni) object is a building or part thereof that:
- Was built, reconstructed, extended, or expanded without građevinska dozvola (construction permit) or other official act
- Was executed in violation of permit conditions or exceeds the permitted area
- Does not have upotrebna dozvola (occupancy permit/usage permit)
The Category of Unauthorized Objects Also Includes
- Auxiliary buildings that form a functional whole with residential or commercial objects
- Buildings for agricultural use
- Cultural heritage objects without permits
- Structures on which rough structural work was performed without permission
Historical Background
After the breakup of Yugoslavia in 1991, seven independent states emerged. Local authorities were unable to keep up with creating new territorial development projects (detailed urban plans - DUP). In some regions, DUPs were not developed for 20-30 years.
As a result, property owners had no chance to obtain official construction permits. The government nevertheless issued list nepokretnosti certificates with the notation "Nema građevinske dozvole" (No construction permit).
According to the Ministry of Tourism and Sustainable Development, there are approximately 100,000 illegally constructed objects in Montenegro.
HOW TO CHECK THE LEGAL STATUS OF PROPERTY
Verification Through List Nepokretnosti
List nepokretnosti is the primary document on property ownership rights in Montenegro, analogous to a land registry extract.
STEP 1: Obtain List Nepokretnosti
The document can be obtained:
- At the Real Estate Administration (Uprava za nekretnine)
- Through the e-Katastar electronic portal
- From a notary
- Through specialized agencies
Cost: 3-5 euros | Timeline: from several hours to 2-3 days
STEP 2: Find the "Podaci o teretima i ograničenjima" Section
This is the last or second-to-last section of the document, containing information about encumbrances and restrictions (G-list).
STEP 3: Interpret the Status
LEGAL OBJECT:
"Ne postoje tereti i ograničenja" (No encumbrances and restrictions exist)
ILLEGAL OBJECT - Requires Legalization:
- "Nema dozvolu"
- "GRADJEVINSKU NITI UPOTREBNU DOZVOLU"
- "Without construction permit"
- "Izgrađen bez građevinske dozvole"
OTHER POSSIBLE ENTRIES:
- Mortgage (hipoteka) - does not affect legal status
- Court disputes - temporary restriction
- Right of use - does not require legalization
What to Do When "Nema Dozvolu" Status Is Discovered
- Clarify the object's history - when it was built, whether it appears on 2017-2018 orthophoto
- Check for submitted legalization documents
- Assess legalization possibility - compliance with plans, location
- Begin the legalization procedure immediately
WHICH OBJECTS ARE SUBJECT TO LEGALIZATION
Objects That CAN Be Legalized
Residential Objects
- Private houses (individual housing construction)
- Multi-apartment buildings (residential complexes)
- Apartments in non-legalized buildings
- Additional residential floors to legal houses
- Villas
- Townhouses
Commercial Objects
- Stores and retail premises
- Office buildings
- Restaurants and cafes
- Hotels and tourist apartments
- Warehouses
Auxiliary Structures
- Garages
- Storage facilities
- Utility buildings
- Swimming pools and sports facilities
- Terraces
- Extensions
Legalization Possibility Criteria
The Object MUST:
- ✓ Be visible on current orthophoto maps (2017-2018 or later survey)
- ✓ Be registered in the cadastre (have list nepokretnosti)
- ✓ Have access from a public road
- ✓ Comply with urban planning norms (or be capable of being brought into compliance)
- ✓ Not violate neighbors' rights (property boundaries)
Objects That CANNOT Be Legalized
Prohibited Zones:
- Coastal strip (first 100 meters from the sea) without special permits
- National park territories
- Protected nature reserves
- Archaeological zones
- Areas designated for infrastructure of public interest
Technical Restrictions:
- Objects exceeding property boundaries
- Temporary structures (without foundation)
- Objects creating safety threats
- Buildings constructed after the law came into force without permits
Special Cases
Primary Residence up to 200 m²:
Simplified procedure without seismic analysis and architectural project. Requirements:
- Proof that this is the only housing
- Family composition certificate
- Notarized statement of responsibility
Savings: 2000-4000€ on technical documentation
Coastal Zones:
Objects in the coastal strip (up to 100m from sea) require:
- Special environmental assessment
- Additional fee for water use (naknade za vodu): 30-60€/m²
- Extended review period: up to 2 years
DOCUMENTS FOR LEGALIZATION
BASIC DOCUMENT PACKAGE (for all objects)
| Document | Description | Cost |
|---|---|---|
| 1. Legalization Application | Form (obrazac) from the municipality or online | Free |
| 2. List Nepokretnosti | Certificate of property ownership | 5-50 € |
| 3. Geodetic Elaborat | Technical document with precise measurements (3 copies) | 300-1000 € |
| 4. Copy of Cadastral Plan | Shows land parcel boundaries | Included in elaborat |
ADDITIONAL DOCUMENTS by Object Size
For Objects up to 200 m² (Primary Residence) - SIMPLIFIED PROCEDURE
Only Required:
- Basic document package
- Notarized statement of responsibility for object safety
- Family composition certificate
- Confirmation of no other housing in Montenegro
Savings: 2000-4000€ on technical documentation
For Objects from 200 to 500 m²
In addition to basic package:
- 5. Seismic Safety Certificate (500-1500€)
- 6. Projekat izvedenog stanja - Architectural project (800-2500€)
For Objects OVER 500 m²
In addition to all above:
- 7. Static Stability Conclusion (1500-5000€)
- 8. Project Revision (1000-3000€)
For Commercial Objects
Additionally:
- 9. Fire Safety Inspection (300-1000€)
- 10. Sanitary-Epidemiological Conclusion (200-600€)
Land Ownership Documentation
Own Land:
- List nepokretnosti for the land parcel
- Cadastral plan
State Land:
- Application for land purchase
- Installment plan up to 240 months (20 years)
- Price: cadastral value + coefficient
Someone Else's Land:
- Owner's consent (saglasnost)
- Notarized agreement
- Or court decision
LEGALIZATION PROCEDURE: STEP-BY-STEP INSTRUCTIONS
STAGE 1: PREPARATORY (1-3 months)
Step 1.1: Checking Legalization Possibility
What to do:
- Obtain list nepokretnosti
- Check object status
- Verify object appears on 2017-2018 orthophoto
- Check compliance with urban planning zone
Result: Understanding whether the object can be legalized
Step 1.2: Ordering Geodetic Elaborat
What to do:
- Find licensed geodetska organizacija
- Order elaborat premera izvedenog stanja
- Surveyors visit the site for measurements
- Documentation preparation: 2-4 weeks
Cost: 300-1000€ | Result: Elaborat in 3 copies
Step 1.3: Ovjera (Certification) of Elaborat in Cadastre
What to do:
- Submit elaborat to Real Estate Administration
- Pay for ovjera: 5€ per copy
- Receive certified copies
Timeline: 3-10 business days
Step 1.4: Registration in Cadastre
If the object is not yet registered:
- Submit application for registration
- Attach certified elaborat
- Receive cadastral number
Timeline: 15-30 days | Cost: 10-20€
Step 1.5: Preparation of Technical Documentation
Depending on object size and type:
- Seismic conclusion (200-500 m²)
- Architectural project (200-500 m²)
- Stability analysis (over 500 m²)
- Additional expertise as needed
Timeline: 1-2 months | Cost: 0-8000€
STAGE 2: SUBMITTING APPLICATION (1 day)
Step 2.1: Determining Submission Authority
Objects up to 500 m² → Local self-government (opština)
Objects over 500 m² or in protected zones → State authority
Step 2.2: Submitting Complete Document Package
Where to submit:
- Municipality's Urban Planning Secretariat
- Or through electronic portal (e-Uprava)
Result: Receipt of document acceptance with case number
STAGE 3: APPLICATION REVIEW (from 2 months to 2 years)
What happens during review:
1. Formal Document Check: 15 days
Reviewing completeness and correctness of submitted documents. If documents are incomplete, you receive notification to correct deficiencies within 8 days.
2. Commission Site Visit: 30-60 days
Formation of commission including:
- Urban planning representative
- Construction inspector
- Architect
- Geodesist
The commission verifies actual state matches elaborat, checks for DUP compliance violations.
3. DUP Compliance Check
Comparison with detailed urban plan:
- Land use purpose (residential, commercial, mixed)
- Maximum permitted building parameters
- Distance from boundaries
- Height restrictions
4. Interdepartmental Coordination: 30-60 days from each authority
Requests sent to:
- Environmental Protection Administration
- Cultural Heritage Protection Directorate
- Utility Services
- Fire Inspection
- Sanitary Inspection
5. Komunalije Calculation
Finance department calculates final amount considering:
- Object area
- Location (coastal/central/peripheral zone)
- Purpose (residential/commercial)
- Year of construction
- Cadastral land value
6. Decision Making: 60-180 days (simple cases) up to 2 years (complex)
- Simple cases (full DUP compliance): 60-90 days
- Standard objects: 4-6 months
- Complex cases (minor violations): 6-12 months
- Objects in protected zones: up to 2 years (extension to 3 years)
STAGE 4: RECEIVING LEGALIZATION DECISION
The positive decision indicates:
- Permission to legalize the object
- Technical characteristics of legalized object
- Smjernice (guidelines) for bringing appearance into compliance
- Timeline for fulfilling conditions: 3 years
- Amount of komunalije fee
- Payment terms (lump sum or installment)
Review and appeal period: 30 days
If you disagree with decision conditions, you can:
- Request clarification
- File appeal
- Provide additional evidence
Decision comes into force:
After 30 days if no appeal is filed, or after appeal review.
STAGE 5: PAYING KOMUNALIJE
Payment options:
1. Lump Sum Payment
- Within 30 days of decision
- Discount up to 20%
- Immediate removal of zabilježba (notation)
2. Installment Plan for Residential:
- Up to 360 months (30 years)
- Monthly payments
- Interest ~2.5% per year
- Possible early repayment without penalties
3. Installment for Commercial:
- Up to 120 months (10 years)
- Interest ~20% over base rate
4. Tourism Objects:
- Up to 60 months (5 years)
- Highest interest rate
5. With Benefits:
- For social categories
- Large families: up to 50% discount
- Single parents: up to 90% discount
- Persons with disabilities: up to 70% discount
STAGE 6: BRINGING INTO COMPLIANCE (within 3 years)
In the decision, the authority may set smjernice - recommendations for bringing the object's external appearance into compliance with urban planning requirements.
Typical requirements:
- Changing facade color
- Bringing roof to uniform style
- Modifying window openings
- Landscaping the territory
- Installing protective fencing
Timeline: 3 years from decision effective date
Confirmation of completion:
- Commission inspects object
- Photographs of completed work
- Act of work completion
STAGE 7: REMOVING ZABILJEŽBA FROM CADASTRE
After all conditions are met:
- Submit application to remove zabilježba
- Attach documents:
- Copy of legalization decision
- Payment confirmation
- Photos of completed work
- Commission act (if required)
- Final inspection (if needed)
- Cadastre update: 15-30 days
STAGE 8: FULL LEGALIZATION
Final status in list nepokretnosti:
"Ne postoje tereti i ograničenja" (No encumbrances and restrictions exist)
What this gives:
- Object is officially legalized
- Can be freely sold, donated, bequeathed
- Possibility of official rental
- Connection of all utilities
- Obtaining loans against collateral
- Property insurance
- Reduction of tax burden
LEGALIZATION TIMELINES
URGENT: Application Submission
Deadline: Until MIDDLE OF FEBRUARY OF 2026 (6 months from law's effective date in August 2025)
What will happen if not submitted:
- Inability to sell or rent property
- Administrative fines
- Increased property tax
- Risk of forced demolition
Application Review by Authorities
| Stage | Timeline |
|---|---|
| Initial document check | 15 business days |
| Simple cases (plan compliant) | 60-90 days |
| Standard objects | 4-6 months |
| Complex cases | 6-12 months |
| Objects in protected zones | Up to 2 years (extension to 3 years) |
Condition Fulfillment Timeline
For bringing object into compliance (smjernice): Up to 3 years
From the moment decision comes into force
Total Legalization Duration
Minimum (all at once): 4-6 months
Standard: 8-12 months + 1-3 years for conditions
Maximum (complex cases): Up to 5 years total
Methods of Legal Procedure Acceleration
- Preparing complete package immediately - saves 1-2 months
- Using "acceleration" right under Administrative Procedures Law
- Professional accompaniment - lawyers know all nuances
- Choosing lump sum payment - priority processing
- Proactive communication - regular status checks
COST OF LEGALIZATION
1. MANDATORY DOCUMENTATION EXPENSES
| Service | Object Size | Cost |
|---|---|---|
| Geodetic Elaborat | Apartment up to 100 m² | 300-500 € |
| House 100-200 m² | 500-800 € | |
| House 200-500 m² | 800-1200 € | |
| Object over 500 m² | 1200-2000 € | |
| Cadastre certification | 3 copies | 15 € |
| List nepokretnosti | Object + land | 6-10 € |
| Seismic conclusion | 200-500 m² | 500-1500 € |
| Architectural project | 200-500 m² | 800-2500 € |
| Static stability analysis | Over 500 m² | 1500-5000 € |
| Project revision | Over 500 m² | 1000-3000 € |
2. KOMUNALIJE FEE (Main Amount)
| Region | Residential Objects | Commercial |
|---|---|---|
| Coastal areas (Budva, Kotor, Tivat) |
70-150 €/m² | 100-200 €/m² |
| Central areas (Podgorica, Nikšić) |
40-80 €/m² | 60-120 €/m² |
| Peripheral areas | 20-50 €/m² | 40-80 €/m² |
Surcharges and Discounts:
- Lump sum payment: +5% rate BUT -20% discount
- Installment residential: +2.5% per year
- Installment commercial: +20% over base
For Coastal Zone:
Additional fee for water use (naknade za vodu): 30-60€/m²
Installment up to 36 months
EXAMPLES OF TOTAL COST
Example 1: 70 m² Apartment, Budva (primary residence)
- Documentation: 350 €
- Komunalije: 7000 € (100€/m²)
- Lump sum discount: -1400 €
TOTAL: ~5950 €
With 30-year installment: ~20-25 € per month
Example 2: 180 m² House, Kotor (secondary residence)
- Documentation: 3500 €
- Komunalije: 16,200 € (90€/m²)
- Water fee: 5400 € (30€/m²)
TOTAL: ~25,100 €
With 10-year installment: ~220 € per month
Example 3: 300 m² Apartments, Budva (commercial)
- Documentation: 8000 €
- Komunalije: 54,000 € (180€/m²)
- Water fee: 15,000 € (50€/m²)
TOTAL: ~77,000 €
With 5-year installment: ~1350 € per month
Ways to Reduce Costs
- Lump sum payment - up to 20% discount (savings 2000-15000€)
- Social benefits - for large families up to 50%, single parents up to 90%
- Primary residence status - simplified documentation (savings 2000-4000€)
- Early application - avoids future increases
- Professional support - avoids costly mistakes
Limited rights:
- Cannot obtain business licenses
- Cannot register legal activities
- Cannot participate in government programs
- Cannot receive subsidies or benefits
Utility Connection Problems
- Electricity: Utility companies may refuse connection or disconnect existing connection
- Water supply: Official connection impossible, must use temporary solutions
- Sewerage: Cannot connect to city system
- Internet/Cable TV: Major providers refuse service
Increased tariffs:
If utilities are connected "informally," tariffs may be 2-3 times higher than standard
Financial Sanctions
Administrative Fines:
- Individuals: 500 - 4000 €
- Entrepreneurs: 1000 - 12,000 €
- Legal entities: 5000 - 40,000 €
Repeated violations:
- Fines double
- Possible criminal prosecution
- Ban on construction activities (for companies)
Increased Taxes
Property tax:
- Standard rate: 0.25% of value
- For illegal objects: 2-3 times increase
- Overpayment over 10 years on 100,000€ house: 2500-5000€
Fee for illegal land use:
- 3-7% of land plot value per year
- No payment deadline exemption
- Accumulates annually
Administrative Consequences
Exploitation ban:
- Inspector's order to cease use
- Seal on doors and windows
- Disconnection of utilities
- Administrative surveillance
Regular inspections:
- Construction inspection: annually
- Urban planning inspection: as needed
- Fire inspection: for commercial
- Sanitary inspection: for food establishments
Additional fines for violations:
- Using sealed object: 2000-8000€
- Obstruction of inspector: 1000-5000€
- False information: 500-3000€
Physical Demolition of Object
When demolition is possible:
- Object built after law came into force without permit
- Located in specially protected zone
- Creates safety threat
- Legalization refusal + expiration of voluntary demolition period
Demolition procedure:
- Inspector's demolition order
- 30 days for voluntary demolition
- If not complied - forced demolition
- All costs borne by owner
Cost of forced demolition:
- Small object: 5000-15,000€
- Medium house: 15,000-40,000€
- Large building: 50,000-200,000€
Additional expenses:
- Debris removal: 50-150€/m³
- Land restoration: 2000-10,000€
- Legal costs: 1000-5000€
Property Devaluation
| Object Status | % of Market Price |
|---|---|
| Legal object | 100% |
| With "nema dozvolu" until 2025 | 70-85% |
| With "nema dozvolu" after 2026 | 40-60% |
| With demolition risk | 10-20% |
Loss example on house worth 200,000€:
- Now: sale for ~140,000-170,000€ (loss 30-60 thousand€)
- In 2 years: sale for ~80,000-120,000€ (loss 80-120 thousand€)
- With demolition threat: sale for ~20,000-40,000€ (loss 160-180 thousand€)
Legal Risks
Neighbor lawsuits:
- For violating boundaries
- For blocking light/view
- For damaging foundations
- Compensation: 5000-50,000€
State lawsuits:
- For illegal land use
- For environmental damage
- For coastal zone violations
- Compensation: 10,000-500,000€
Consequences for Foreigners
Residence permit issues:
- May refuse temporary residence renewal
- May revoke permanent residence
- Complications with citizenship application
Reputational risks:
- Entry in violation database
- Complications with future property purchases
- Problems opening businesses
Consequences for Tourism Business
Activity ban:
- Cannot obtain tourist license
- Existing license revocation
- Removal from booking platforms
- Exclusion from tourist zone
Financial losses:
- Loss of season income: 10,000-100,000€
- Guest cancellation compensation
- Platform penalties
- Reputation damage
PROFESSIONAL LEGALIZATION ASSISTANCE
Legalization Center
Specialized institution in Montenegro providing comprehensive professional assistance in the property legalization process for all types of objects.
Our Services
Initial Consultation and Object Audit
What we check:
- Current status in cadastre
- List nepokretnosti analysis
- Legalization possibility assessment
- Identification of potential problems
- Preliminary cost calculation
- Timeline determination
Result: Detailed report with recommendations and action plan
Cost: FREE with full accompaniment order
Legal Support
We handle:
- Preparation of all applications and requests
- Interaction with municipality
- Representing your interests in government bodies
- Obtaining all approvals
- Monitoring compliance with deadlines
- Appeals if necessary
- Legal protection in court
Feature: We use the "acceleration" mechanism under Administrative Violations Law if authorities fail to meet legal deadlines
Technical Documentation Organization
Our partners - licensed specialists:
- Geodetska organizacija - elaborat premera development
- Architectural bureau - projekat izvedenog stanja
- Engineering services - seismic analysis and stability verification
- Expert assessors - additional expertise
Advantages:
- Verified partners with experience
- Optimal price without markups
- Quality guarantee
- Quick turnaround
4. Full "Turnkey" Process Support
What's included:
- Stage 1: Audit and strategy (1-2 weeks)
- Stage 2: Documentation preparation (1-3 months)
- Stage 3: Application submission (1 day)
- Stage 4: Review accompaniment (2-24 months)
- Stage 5: Receiving decision and payment (as ready)
- Stage 6: Assistance fulfilling conditions (up to 3 years)
- Stage 7: Removing zabilježba from cadastre (final)
5. Specialized Services
For foreigners:
- Documentation translation
- Power of attorney preparation
- Remote service
- English-speaking support
For commercial real estate:
- Business license preparation
- Fire safety coordination
- Sanitary requirements
- Activity permits
For problem zones:
- Protected areas
- Coastal strip
- National parks
- Cultural heritage sites
6. Remote Service
For clients abroad:
- Video consultations
- Electronic document submission
- Power of attorney for all actions
- Regular reporting
- Document delivery anywhere in world
Why Choose Us
- Experience and expertise - over 500 successfully legalized objects
- Comprehensive approach - solve ALL issues "turnkey"
- Transparency - detailed estimate before work begins
- Guarantees - contract with clear obligations
- Speed - begin work immediately, without delay
- Individual approach - personalized solutions for complex cases
- Legal protection - defense of your interests at all stages
Our Service Costs
| Service Package | Objects | Cost |
|---|---|---|
| Basic package | up to 200 m² | from 800 € |
| Standard package | 200-500 m² | from 1200 € |
| Premium package | over 500 m², commercial | from 2000 € |
Result Guarantees
We guarantee:
- Obtaining positive decision (if object meets criteria)
- Compliance with agreed timelines (within our control)
- Documentation quality
- Correct calculation of komunalije
- Legal protection at all stages
If result not achieved due to our fault:
- Full refund of paid amount
- Compensation of expenses
- Free repeated attempt
How to Start
Step 1: Contact
Call, write, or visit our office. We work 6 days a week.
Step 2: Free Consultation
We'll discuss your situation, answer questions, preliminary assess prospects.
Step 3: Object Audit
We'll conduct detailed analysis, prepare report with recommendations and cost calculation.
Step 4: Contract Signing
We'll formalize cooperation, discuss all details, establish timelines.
Step 5: Work Begins
We immediately begin preparing documents and coordinating with authorities.
Client Reviews
Ivan P., Budva
"We legalized an apartment in Budva through the Center. Everything was done quickly and professionally. Especially pleased with constant communication and lack of hidden fees. Recommend!"
Maria K., Kotor
"We contacted with complex case - house in coastal zone. Lawyers handled everything, received all necessary approvals. Grateful for help!"
John D., United Kingdom
"As a foreigner, was worried about legalization process. The Center team provided full support, everything was done remotely. Excellent service!"
Frequently Asked Questions
Q: Is legalization mandatory?
A: Yes, if you want to freely dispose of property. Since August 2025, notaries do not certify transactions with "nema dozvolu" objects.
Q: How long does legalization take?
A: From 6 months to 2 years depending on object complexity. The most important thing - submit application before middle of february of 2026.
Q: Can I do everything myself?
A: Yes, but practice shows that professional support significantly speeds up process and helps avoid costly mistakes.
Q: What if legalization is refused?
A: Decision can be appealed. We help clients at all stages, including court if necessary.
Q: Can I pay komunalije in installments?
A: Yes, for residential objects up to 30 years, for commercial up to 10 years.
CONTACT LEGALIZATION CENTER
TIME IS RUNNING OUT! Application submission deadline limited: until middle of february of 2026
Each day of delay:
- Increases queue at government agencies
- Reduces time to fulfill conditions
- Brings closer to fines and sanctions
- Decreases your property value
Get FREE consultation!
Phone:+382 68 468 468
WhatsApp/Viber:+38268468468
Office: Montenegro, Bar, Budva, Podgorica by appointment only
Business Hours:
Mon-Fri: 9:00 - 18:00
Sat: 10:00 - 14:00
2025 Property Legalization Center in Montenegro
All rights reserved. Information current as of November 2025.
Disclaimer: This article is for informational purposes. For decisions regarding specific objects, individual legal consultation is recommended.